Originally Posted by
Chef2000
Today we moved all of the prefabricated pieces ,for a brand new wilcox south shelter, from the AMC mt greylock tool shed over to a staging area .2 of mile from the shelter site.
We then moved a majority of it downhill, past the soon to be old shelter, past the privy to the new site. Some of these pieces were 18 ft long and weighed over 100 pounds. Special thanks to all the great dudes from Massachusetts DCR trail crew, you guys rock.
Work parties are scheduled every Sat and Tues thru July 3. I will be going out next Tuesday. A great opportunity to do somethin for the AT other then just talk about it. Check out AMC berkshire website for more details