WhiteBlaze Pages 2024
A Complete Appalachian Trail Guidebook.
AVAILABLE NOW. $4 for interactive PDF(smartphone version)
Read more here WhiteBlaze Pages Store

Results 1 to 7 of 7
  1. #1

    Default ST8 - S-Tree CG to Arvel, Ky

    I have taken this year off from hiking to focus on other things. This was my first trip back on trail since January and at only 27 miles for the weekend it beat me up good! Not a lot to discuss about this stretch of ST. IT was first trip using guthooks which came in handy several times. Water was scarce but lots of tenting options thru here. Only 1 mile of road walking in this stretch, no water crossings(may be because water levels are low).
    Several blowdowns. Seems like on the ST a new trail is cut before a blowdown is removed... About 2.2 miles north of Turkeyfoot CG is one of the best campsites ive ever seen along the War Fork Creek.
    Trail Miles: 4,927.6
    AT Map 1: Complete 2013-2021
    Sheltowee Trace: Complete 2020-2023
    Pinhoti Trail: Complete 2023-2024
    Foothills Trail: 0.0
    AT Map 2: 279.4
    BMT: 52.7
    CDT: 85.4

  2. #2
    Registered User Slugg's Avatar
    Join Date
    04-07-2017
    Location
    Georgia
    Age
    31
    Posts
    364

    Default

    Glad to see you’re back at it.

    I’ve not hiked on either trails, but from what I’ve read the Cumberland Trail has a similar issue with new trail being created while existing trail is neglected. This doesn’t seem like the right way to go about it, I can see folks going for a hike on a neglected section, being unhappy with the conditions, and potentially never return to the trail. Got to maintain what’s already there first and foremost. Just my two cents, I’m no expert.

  3. #3
    Registered User Siestita's Avatar
    Join Date
    07-06-2007
    Location
    Frankfort, KY
    Age
    74
    Posts
    371
    Journal Entries
    1

    :banana

    Perhaps "new trail" is not deliberately cut by maintainers. Instead, hikers' impromptu detours form short "use trails" around blow downs. The Trace gets some maintenance, but not always quickly. And, having a few blow downs that must be climbed through or walked around arguably can be beneficial. The presence of a few blow downs on foot paths can discourage illegal trail use by bicyclers, mechanized bikers, and "4 wheelers".

    Yes, I realize that some part of the Sheltowee Trace permit those "other uses", such as, for example, much of the trail that you, Gambit, just walked between S Tree and Turkey Foot. The challenge is to keep the mechanized users off of the trail segments where they are theoretically banned. The Forest Service has only limited enforcement resources.
    Last edited by Siestita; 11-01-2022 at 15:44.

  4. #4
    Registered User Siestita's Avatar
    Join Date
    07-06-2007
    Location
    Frankfort, KY
    Age
    74
    Posts
    371
    Journal Entries
    1

    Default

    I've only spent a few days and nights on the Cumberland Trail, in its northern section. I'll not return there, partly due to the lack of trail marking and maintenance. With Forest Service sponsorship, the Sheltowee Trace, which I have section hiked in its entirety, seems to be better maintained. But, walkers' expectations matter. Hiking the Trace will never be quite like strolling along a city park trail, nor is it a hikers' super highway/turnpike like much of the AT.

  5. #5
    Registered User Slugg's Avatar
    Join Date
    04-07-2017
    Location
    Georgia
    Age
    31
    Posts
    364

    Default

    Quote Originally Posted by Siestita View Post
    Perhaps "new trail" is not deliberately cut by maintainers. Instead, hikers' impromptu detours form short "use trails" around blow downs.
    I’m sure there’s some of that, but what I am referring to, and what I interpreted Gambit is referring to, IS new trail deliberately cut by maintainers where trail did not previously exist in an effort to “complete” it. Blow downs are one thing, but I’ve read several reports on both of these trails where the trail ceases to exist entirely. That, imo, should be addressed before new single track is cut.

  6. #6
    Registered User Slugg's Avatar
    Join Date
    04-07-2017
    Location
    Georgia
    Age
    31
    Posts
    364

    Default

    I plan to hike them both, regardless of conditions. Just a topic I thought worth discussing.

  7. #7
    Registered User Prov's Avatar
    Join Date
    05-29-2010
    Location
    Chicago
    Age
    49
    Posts
    46

    Default

    I’m in full agreement that there is a huge focus on extending this trail while existing trail *really* needs a lot of love. Some very necessary larger bridges were out (plus one I remember being terrifying), and I couldn’t stop wondering if new trail (single track) could be cut in the heavy ATV areas in Daniel Boone NF. A huge amount of the shared trails were in brutal shape, worse than any other ATV trails I’ve ever been on, to the point that motorized vehicles are starting to make more tracks through the woods to go around the massive endless deep dips in the trail (that were filled from end to end with water in the spring when I thru hiked).

++ New Posts ++

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •