    Quote Originally Posted by Slo-go'en View Post
    Man, there really isn't any other way across with in reason. It's either walk the 340 or swim.
    So absolutely no way to move the road walk off the road?

    The ATC has had great success doing that in other places, why not here?

  2. #182
    Registered User JNI64's Avatar
    Join Date
    01-23-2019
    Location
    Harpers ferry wv.
    Age
    60
    Posts
    2,087

    Default

    Quote Originally Posted by gpburdelljr View Post
    Or, as suggested by the ATC, use a shuttle. Eventually the ATC will implement something else, either a rebuilt footbridge, or a reroute. It’ll happen when it happens. There’s no point to fretting about things we have no control over.
    ....................................... , , . !!

  3. #183
    Furlough's Avatar
    Join Date
    03-17-2004
    Location
    Northern Virginia
    Age
    62
    Posts
    900
    Images
    124

    Default

    I was looking at the River Riders Web site this morning and see that they are a Gold Sponsor of the ATC. There may be an opportunity there.
    "Too often I would hear men boast of the miles covered that day, rarely of what they had seen." Louis L’Amour

  4. #184

    Default

    Quote Originally Posted by rickb View Post
    So absolutely no way to move the road walk off the road?

    The ATC has had great success doing that in other places, why not here?
    If you take a walk on the road via Google Earth street view, you can see why. There does look to be a reasonably wide shoulder for most of the distance on the river side, but it does narrow down and nearly disappears in places. The posted speed limit is 45, so you can bet most are going 55.


    Just noticed another thing. There is no pedestrian foot path across the sandy hook bridge. Jersey barriers are right up against the old cast iron guard rails and there is no shoulder. Plus I saw big rigs on the road leading up to the bridge. No way would I try to walk across there, except maybe at 3 in morning.

    The only other option would be to re-route the trail to come down the east side of the ridge to get closer to the 340 bridge crossing. However, the east side of the ridge has a number of houses on it. I would guess most of that land is private property. It might be possible to cut through someone's backyard to connect to one of the roads that goes up the side of the ridge. But cutting a new trail is something that takes years too. Still have the problem of getting across the bridge safely.


    Guess it's a good thing I did HF NOBO last spring
    Last edited by Slo-go'en; 01-26-2020 at 10:51.
    Follow slogoen on Instagram.

  5. #185
    GA-ME 2011
    Join Date
    03-17-2007
    Location
    Baltimore, MD
    Age
    66
    Posts
    3,069
    Images
    9

    Default

    The ATC put out an update on the HF bridge, not much new:
    "The #AppalachianTrail footbridge crossing the Potomac River in Harpers Ferry is still out of commission following the train derailment on Dec. 21, 2019, negotiations are underway to ensure that the footbridge is restored as quickly as possible.Details on the restoration and timetable for reopening the footbridge have not been finalized, however — while the footbridge remains closed, hikers should continue to make their own arrangements for shuttle services to bypass the closure.
    Hikers are not advised to walk on Highway 340 to cross into Maryland, as this roadway has narrow shoulders and heavy traffic. Information about available transportation options can be found at appalachiantrail.org/transportation."

    https://www.facebook.com/ATHike/?__t...ref=nf&__xts__[0]=68.ARDlM70RZMQATJmXCwmrQ3HMGXTc5T2138EKOtAJfVTteI ZO3qXL8JXs3QIkHFAlu5gjcwC3BsmQdKOLCVi5tzJwMINF2ayK Kec8Lu9V0KdkYqkxJ8jz3rEcSpz7u-fmaPx6J3nMo8rjLDGZ6LfCtt54XqSWMgvoKU5WDGaHlml31Eq5 QxEdK49i4HbV9BaKY2HLDA26hMGQVcbS-JckwB3tjIBi59KBmHZFVTdEeUlFzEBNc6R0s6vf-eQKZ28uAEfRo0dCDByHhW-bnaBjj8twUYce1sJBxXACDE1Yh6f0JyS9sUc7WzSLd6vwiy5pZ L_xjz2Nzm-bHvy2UulFasmAfA9M-7g15Qd-JEsNtUBpKvXFqq9i

    "Chainsaw" GA-ME 2011

  6. #186
    ME => GA 19AT3 rickb's Avatar
    Join Date
    12-12-2002
    Location
    Marlboro, MA
    Posts
    7,145
    Journal Entries
    1
    Images
    1

    Default

    Good to hear negotiations are under way with contractors to repair the footway over the river.

  7. #187
    Registered User
    Join Date
    08-12-2015
    Location
    Newark, DE
    Age
    64
    Posts
    566

    Default

    Quote Originally Posted by rickb View Post
    Good to hear negotiations are under way with contractors to repair the footway over the river.
    I saw his, but it seemed to say the same thing they said a month ago? Did you see something that they are talking with contractors?

  8. #188

    Default

    Quote Originally Posted by SkeeterPee View Post
    I saw his, but it seemed to say the same thing they said a month ago? Did you see something that they are talking with contractors?
    It's a pretty complex process with a lot of moving parts that have to be addressed prior to engaging contractors who will do the actual rebuilding. Financial responsibility alone may become a litigious hurdle prior to performing the engineering work and develop plans that will need review and permitting before much visible work can start. While this may be fast tracked, it will still take a few months to get things sorted out.

    In the meantime, there is a business opportunity there for the entrepreneur.

  9. #189
    ME => GA 19AT3 rickb's Avatar
    Join Date
    12-12-2002
    Location
    Marlboro, MA
    Posts
    7,145
    Journal Entries
    1
    Images
    1

    Default

    Quote Originally Posted by Traveler View Post
    It's a pretty complex process with a lot of moving parts that have to be addressed prior to engaging contractors who will do the actual rebuilding. Financial responsibility alone may become a litigious hurdle prior to performing the engineering work and develop plans that will need review and permitting before much visible work can start. While this may be fast tracked, it will still take a few months to get things sorted out.

    In the meantime, there is a business opportunity there for the entrepreneur.
    So no party has taken the lead on rebuilding the bridge yet?

    If so, the ATC needs to get moving on a re-route now.

    Having an incomplete Trail is not acceptable, and is dangerous!

  10. #190

    Default

    Quote Originally Posted by rickb View Post
    So no party has taken the lead on rebuilding the bridge yet?
    If so, the ATC needs to get moving on a re-route now.
    Having an incomplete Trail is not acceptable, and is dangerous!
    I agree with you but have you let the ATC know directly? I know Laurie follows the forum, but making direct contact with them will send a more urgent message. Here's the page for contact details:
    http://appalachiantrail.org/home/about-us/get-in-touch

    Scott

  11. #191

    Default

    Quote Originally Posted by rickb View Post
    So no party has taken the lead on rebuilding the bridge yet?

    If so, the ATC needs to get moving on a re-route now.

    Having an incomplete Trail is not acceptable, and is dangerous!
    You can always take a shuttle, as recommended the ATC, until the bridge is rebuilt. The ATC, and NPS, have limited budgets. It’s quite possible that the RR, or their insurance, will pay to rebuild the foot bridge. A reroute of the trail could be costly to get the proper easements, and build the reroute. I think it is perfectly reasonable for hikers to use a shuttle until the footbridge is rebuilt.
    Last edited by gpburdelljr; 02-01-2020 at 20:35.

  12. #192

    Default

    Quote Originally Posted by gpburdelljr View Post
    You can always take a shuttle, as recommended the ATC, until the bridge is rebuilt.
    That will likely be the only real option for a while. The only question is how long? A season or two? Apparently it's illegal to hitchhike on the 340, but one might chat up a tourist leaving town in that direction...
    Follow slogoen on Instagram.

  13. #193
    Registered User
    Join Date
    09-18-2002
    Location
    Central KY
    Age
    57
    Posts
    599
    Images
    1

    Default

    I’ll be damned if I waited 15 years to thru hike and end up taking a yellow blaze? Not going to happen.
    My name is Tabasco and I approve this message.

  14. #194

    Default

    I suspect this will take a couple of years to work out. First there has to be a determination for responsibility (all RR fault or perhaps some other factor/party has partial). Then there has to be some sort of determination of how much liability they bare and an attempt to settlement. This could be fast or dragged out for years in legal limbo. Then there is getting the bridge replaced. Are there new regulations that require new environmental studies to be performed? Finding someone who can do the work within the financial limitations of the settlement and then getting the thing actually built. Unless the government steps in with some financial backing to help move things along, I betting on 5 years. Someone want to start a poll on how long they think?

  15. #195

    Default

    Quote Originally Posted by Tabasco View Post
    I’ll be damned if I waited 15 years to thru hike and end up taking a yellow blaze? Not going to happen.
    Then don’t go, or you could carry a piece of white tape and put in on the shuttle at HF, then it is no different than riding the canoe across the Kennebec river crossing.

  16. #196
    Registered User
    Join Date
    09-18-2002
    Location
    Central KY
    Age
    57
    Posts
    599
    Images
    1

    Default

    Quote Originally Posted by gpburdelljr View Post
    Then don’t go, or you could carry a piece of white tape and put in on the shuttle at HF, then it is no different than riding the canoe across the Kennebec river crossing.
    You hike your hike. I’ll hike mine.
    My name is Tabasco and I approve this message.

  17. #197
    Registered User JNI64's Avatar
    Join Date
    01-23-2019
    Location
    Harpers ferry wv.
    Age
    60
    Posts
    2,087

    Default

    Quote Originally Posted by Tabasco View Post
    You hike your hike. I’ll hike mine.
    I think as of now they're only offering shuttles to weaverton? Maybe by the time thru hikers start coming through someone will be offering shuttles to sandy hook rd . That would put you right across the bridge on the c&o, AT . If not you'll have to back track the 3.5 miles or so . It's pretty easy to do , if you don't want to miss any steps it's a nice easy flat walk along the river. ( AT- c&o canal) .

  18. #198
    ME => GA 19AT3 rickb's Avatar
    Join Date
    12-12-2002
    Location
    Marlboro, MA
    Posts
    7,145
    Journal Entries
    1
    Images
    1

    Default

    Quote Originally Posted by gpburdelljr View Post
    Then don’t go, or you could carry a piece of white tape and put in on the shuttle at HF, then it is no different than riding the canoe across the Kennebec river crossing.
    The Blaze on the canoe is cute, but it’s not the Trail.

    Hikers are traveling over the AT as it crosses the Kennebec River— even if they are in canoe.

    Taking a shuttle out of (or into) Harpers Ferry is fundamentally different.
    Last edited by rickb; 02-01-2020 at 22:26.

  19. #199

    Default

    Quote Originally Posted by Tabasco View Post
    You hike your hike. I’ll hike mine.
    Since a shuttle at HF is unacceptable to you, I assume you won’t start a thru hike until the bridge is rebuilt. I hope you don’t have to wait another 15 years until everything is perfect for your hike.

  20. #200
    ME => GA 19AT3 rickb's Avatar
    Join Date
    12-12-2002
    Location
    Marlboro, MA
    Posts
    7,145
    Journal Entries
    1
    Images
    1

    Default

    Quote Originally Posted by Lone Wolf View Post
    they can pay for a shuttle and deal with it
    Nothing to do with money.

Page 10 of 15 FirstFirst ... 6 7 8 9 10 11 12 13 14 ... LastLast
++ New Posts ++

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •