    The Amesville Bridge by the power plant in Falls Village CT has been reopened. The relocation signs have been covered by the contractor and the AT is now open through the area.

    NOTE: We have been notified by the contractor that the bridge will be closed again starting approximately March 15th for 4-6 weeks for additional work. At this time, the relocation signs will be uncovered and the relocation will once again be the official route of the AT. Be sure to check on the ATC website for the most up-to-date information.

    http://www.appalachiantrail.org/home.../trail-updates

  2. #22

    Default

    Check the ATC Update page. Looks like the bridge is open for a little while.

  3. #23
    Registered User
    Join Date
    01-31-2016
    Location
    Berwyn Heights MD
    Age
    54
    Posts
    19

    Default

    Any updates on the bridge situation?

  4. #24
    Registered User
    Join Date
    01-31-2016
    Location
    Berwyn Heights MD
    Age
    54
    Posts
    19

    Default

    never mind....